
Heavy Civil & Construction
40-ton crawler crane — cracked boom, Portsmouth yard
Friday-night emergency call. Full-pen structural weld-out on a cracked boom, inspected and back in service Saturday morning.
Projects
A slice of recent work. Every project documented here hit its deadline, held its inspection, and is still in service.

Heavy Civil & Construction
Friday-night emergency call. Full-pen structural weld-out on a cracked boom, inspected and back in service Saturday morning.

Equipment Rental Fleets
Full cutting-edge replacement, side-wall rebuild, and chromium-carbide overlay for an extra season of rental-fleet service.

Marine & Shipyard
Vessel had to sail Monday. Dockside TIG welding on 90/10 copper-nickel sea-water piping — hydrotested and cleared.

Heavy Civil & Construction
Full-penetration groove welds on beam-to-column moment connections for a commercial project. AWS D1.1 qualified procedure, CWI-verified.

Plant & Manufacturing
Compressed shutdown window at an asphalt plant. Multi-rig crew cleared the full scope with daily-pass-log documentation for the plant file.

Utilities & Energy
Engineered skid frame fabricated from client DWG — CNC plasma cut, welded, finished, ready to receive process equipment.
Have a problem no one else will touch?
Cracked booms at 2am. Pressure-line rebuilds under a compressed shutdown window. Copper-nickel on a vessel that has to sail Monday. Call.